Inside HASHTAG
How we work, what we build, and how it all fits together.
Behind the Project
HASHTAG is more than a research project – It’s a coordinated effort to make trusted digital agriculture a reality. This section gives you a look inside the engine room of the project.
From GNSS integration and EO processing, to farm data standards and stakeholder engagement, the 11 Work Packages (WPs) form the foundation for everything HASHTAG sets out to do.
These are grouped into:
• Trusted data from machinery, navigation systems, and Earth observation
• Integration, feedback, communication, and project coordination
Work Packages
WP1 - Coordination
Lead: AeroVision
Objective: Ensure the project runs smoothly, meets its objectives, and maintains high-quality standards across the consortium.
Tasks:
- Project coordination and financial management
- Consortium progress and reporting
- Risk management and quality control
- Data management and ethics
Key Deliverables:
- D1.1 Project Progress Report
- D1.2 Data Management Plan
WP2 - Requirements
Lead: AeroVision
Objective: Define technical and user requirements to guide all system components and ensure alignment with stakeholder needs.
Tasks:
- T2.1 Stakeholder identification and persona definition
- T2.2 Scenario and use case definition
- T2.3 System architecture and technical requirements
Key Deliverables:
- D2.1 Requirements & Use Case Report
- D2.2 Architecture Document
WP3 - Machinery Data Flow – Design & Development
Lead: Wageningen Research
Objective: Design reliable and certifiable data flows from agricultural machines using open standards.
Tasks:
- T3.1 Machinery data structure definition
- T3.2 Logging mechanism for as-applied data
- T3.3 Certification design using ISOXML/Shapefile formats
Key Deliverables:
- D3.1 Machine Data Flow Design
- D3.2 Test Plan for Machinery Data
WP4 - NAV Elements – Design & Development
Lead: IFEN GmbH
Objective: Develop and integrate Galileo HAS and OSNMA services for secure and accurate field positioning.
Tasks:
- T4.1 Integration of HAS-IAR into GNSS receivers
- T4.2 OSNMA authentication implementation
- T4.3 Test scenarios for GNSS validation
Key Deliverables:
- D4.1 NAV Design Specification
- D4.2 NAV Test Plan
WP5 - EO Elements – Design & Development
Lead: TerraSphere
Objective:
Create transparent EO data workflows to generate trusted prescription maps for field operations.
Tasks:
- T5.1 EO input assessment and integration
- T5.2 Prescription map processing pipeline
- T5.3 Digital certification and workflow reproducibility
Key Deliverables:
- D5.1 EO Workflow Design
- D5.2 EO Test Plan
WP6 - Machinery Data Flow – Validation
Lead: Wageningen Research
Objective:
Test and validate data flows developed in WP3 in real agricultural settings.
Tasks:
- T6.1 On-farm validation setup
- T6.2 Field testing and data collection
- T6.3 Evaluation of data consistency and traceability
Key Deliverables:
- D6.1 Machinery Data Validation Report
WP7 - NAV Validation
Lead: IFEN GmbH
Objective:
Validate the performance and robustness of HAS and OSNMA integration under lab and field conditions.
Tasks:
- T7.1 Field performance validation of HAS-IAR
- T7.2 Authentication testing with OSNMA
- T7.3 Report on accuracy and reliability
Key Deliverables:
- D7.1 NAV Validation Report
WP8 - EO Validation
Lead: TerraSphere
Objective:
Validate the EO workflows and prescription maps against operational farming needs.
Tasks:
- T8.1 EO workflow implementation in demo sites
- T8.2 Performance benchmarking
- T8.3 User feedback integration
Key Deliverables:
- D8.1 Validation Report
WP9 - Integration
Lead: AeroVision
Objective:
Integrate all building blocks (machine data, EO, GNSS) into a unified system for CAP-aligned reporting.
Tasks:
- T9.1 Component alignment and system testing
- T9.2 System integration and pilot deployment
- T9.3 Development of a data certification toolkit
Key Deliverables:
- D9.1 Use Case Demonstration Report
- D9.2 Integration Report
- D9.3 HASHTAG Test Kit
WP10 - Stakeholder Feedback
Lead: ABE
Objective:
Gather insights from users and stakeholders through feedback loops and national showcases.
Tasks:
- T10.1 Stakeholder consultations and surveys
- T10.2 Showcase events
- T10.3 Feedback analysis for exploitation
Key Deliverables:
- D10.1 Stakeholder Feedback Report
WP11 - Dissemination, Exploitation & Communication
Lead: ABE
Objective:
Maximise project visibility, support uptake, and develop a plan for sustained use and impact of HASHTAG’s results.
Tasks:
- T11.1 Communication & Dissemination Strategy
- T11.2 Content creation and outreach (web, social, media)
- T11.3 Exploitation planning and stakeholder engagement
Key Deliverables:
- D11.1 Plan for Dissemination, Exploitation and Communication
- D11.1 Midterm DEC Report
- D11.1 Initial Business Plan
- D11.1 Final Exploitation Roadmap
Milestones
|
Milestone |
WP(s) |
Month |
Description |
|
M1 – Kick-off |
WP1 |
M1 |
Grant signed, coordination procedures in place |
|
M2 – Requirements Review |
WP2 |
M3 |
User needs, architecture and use cases confirmed |
|
M3 – Test Readiness |
WP3, WP4, WP5 |
M12 |
All components developed and test-ready |
|
M4 – Integration Ready |
WP6, WP7, WP8 |
M16 |
Validated building blocks ready for integration |
|
M5 – Integration Done |
WP9 |
M20 |
Full system integrated and functioning |
|
M6 – Final Review |
WP10 |
M24 |
Project results verified through stakeholder evaluation |